Subdivision guide

Subdivision in Perth, explained simply.

Thinking about subdividing, or partnering on a subdivision? Here is what it means, the main types in Western Australia, and the questions people ask us most.

The basics

What is subdivision?

Subdivision is the process of dividing one piece of land into two or more separate lots, each of which can be sold, built on or kept on its own.

In Western Australia, every subdivision needs approval from the Western Australian Planning Commission. Once the approval conditions are met, Landgate issues a new title for each lot.

Done well, subdivision unlocks the value already sitting in a block of land. Done poorly, it can mean delays and surprises. That is why we do the due diligence first.

Types of subdivision in WA

Three common ways to divide land.

The right type depends on the land, the planning rules and what you want to do with the lots afterwards.

I

Green title

Each lot is fully independent, with its own title and no shared areas or strata company. Owners have the most freedom to build, sell or renovate. It usually needs more services work, as each lot connects separately.

II

Survey strata

Lots are defined by survey boundaries, much like green title, but there may be common property such as a shared driveway. A strata company looks after anything shared. It is popular for battle-axe and side-by-side blocks.

III

Built strata

Lots are defined by the buildings on them, such as villas or units, and are created once construction is complete. Owners share common property and are members of a strata company.

IV

Which is right?

We assess each site and recommend the type that gives the best outcome, taking into account approvals, servicing, timing and what buyers in the area want.

R-Codes explained

The rules that decide how many lots you can create.

The Residential Design Codes of Western Australia, known as R-Codes, control how residential land can be developed. Each property is given a density code by the local planning scheme.

The code sets the minimum and average lot sizes, which decides how many lots a block can be divided into. A higher code allows smaller lots, so more of them. The codes also cover things like setbacks, open space and building height.

Two blocks of the same size can have very different potential because of their R-Code, their shape and their access. We check the R-Code and the local planning rules as part of our due diligence on every site.

The process

From idea to new titles.

Every subdivision follows the same path. Here is how we run it with our partners.

  1. Step 01

    Find the site

    We search for land with the right zoning, services and buyer demand, and walk away from most of what we look at.

    You see: why we chose it
  2. Step 02

    Due diligence and settlement

    Planning, engineering, soil and title checks are completed before we settle on the site with our JV partners.

    You see: the full due diligence
  3. Step 03

    WAPC approval

    We apply to the Western Australian Planning Commission to subdivide, and work through the conditions with council and engineers.

    You see: the approval and its conditions
  4. Step 04

    Civil works

    Earthworks, roads, drainage, water, sewer and power are built to every new lot by experienced contractors.

    You see: progress on site, with photos
  5. Step 05

    New titles

    Once conditions are cleared, the plan is lodged and Landgate issues a new title for each lot.

    You see: the titles issued
  6. Step 06

    Sales and exit

    Lots are sold to home builders and buyers. When they settle, the JV is wound up and the profit is shared.

    You see: every sale and the final result

More on how we work

Questions

Subdivision FAQ.

Can my block be subdivided?

It depends on the zoning and R-Code of your land, its size and shape, and whether services such as water, sewer and power can reach each new lot. We can look at your property and tell you whether subdivision is possible and which type suits it.

Do I need approval to subdivide?

Yes. Every subdivision in Western Australia needs approval from the Western Australian Planning Commission (WAPC). The local council and service providers are consulted, and the approval usually comes with conditions that must be met before new titles are issued.

What are approval conditions?

They are the works and requirements the WAPC sets before it will sign off. Common examples are connecting water and sewer, providing power, building crossovers or driveways, removing old structures and meeting drainage requirements.

Do I need to keep my existing house?

Not always. Some owners keep the existing home on one lot and create a new lot at the back or side. Others demolish and start fresh. The right choice depends on the house, the block and your goals.

Who does the work?

A subdivision involves a licensed surveyor, planners, engineers, service providers, contractors and a settlement agent. We manage the whole team for you, so you have one point of contact from the first conversation to the new titles.

What happens after the titles are issued?

You can sell the new lots, build on them, or keep them as an investment. Through our channel partners we can help with sales, building and property management.

Can I subdivide without doing it alone?

Yes. That is what 88 Land is built for. We can partner with you in a joint venture, so you have an experienced team beside you and share in the result.

Next step

Find out what your land could become.

Book a free consultation. We will talk through your property or your goals, with no obligation.